LISTENINGPOST

People ops

Comp Band Context

Locate the applicable approved compensation range.

Configure this skill

The page and the file follow your answers.

CRM
Email
Chat
Documents
Calendar
Project tools

6 of 6 systems connected

KeepDirectMissing
Your assistantSKILL.md

Download ↓
Morning Brief

Build a prioritized brief for today from the caller's calendar, messages, documents and project records, using Keep MCP. Read only.

1. Read today's calendar events, open assigned tasks, direct requests since the last brief and unresolved commitments.
2. Separate active incidents, decisions waiting on the caller, external deadlines and routine work. Check for replies before calling an item outstanding. Rank by consequence and time remaining.
3. Fit proposed actions around fixed meetings and flag conflicting commitments.

Result: a dated brief with urgent changes, commitments, meeting preparation and a feasible next-action list, each tied to its source.

When to use it

Locate the applicable approved compensation range.

What it covers

Inputs

Role/level, entity, work location, effective date, authorized audience.

Result

Applicable band, effective date, components and approval/exception requirements.

What it uses

People recordsCalendarEmailDocumentsSlackCRMRead only
For developers

Retrieval instructions

Resolve people, accounts and projects by stable identifiers. Use only the sources this task needs. Cite the source and date for each finding. Keep source systems unchanged.

Data sources

Rippling, Google Workspace, Slack, Attio.

Procedure

  1. Call keep_status and report freshness for: Rippling, Google Workspace, Slack, Attio. If a required connector for Comp Band Context is disconnected or stale, say so up front.
  2. Resolve inputs for Comp Band Context: role, candidate, req_id, time_window. Default time window: open reqs and active interview loops (override if caller provides time_window). Ask only for missing critical inputs.
  3. keep_memory_read for open tasks, decisions, and handoffs relevant to Comp Band Context (filter out unrelated day-plan noise).

Related skills

People ops →
Contractor Conversion Check→Prepare context for an employment-arrangement change.Critical Role Vacancy Risk→Assess operational exposure from unfilled roles.CSM Hiring Pulse→Prepare a csm hiring review. Uses time window, account, renewal window, csm book.