LISTENINGPOST

Projects

Decision Log Continuity

Maintain a traceable project decision record.

Configure this skill

The page and the file follow your answers.

CRM
Email
Chat
Documents
Calendar
Project tools

6 of 6 systems connected

KeepDirectMissing
Your assistantSKILL.md

Download ↓
Morning Brief

Build a prioritized brief for today from the caller's calendar, messages, documents and project records, using Keep MCP. Read only.

1. Read today's calendar events, open assigned tasks, direct requests since the last brief and unresolved commitments.
2. Separate active incidents, decisions waiting on the caller, external deadlines and routine work. Check for replies before calling an item outstanding. Rank by consequence and time remaining.
3. Fit proposed actions around fixed meetings and flag conflicting commitments.

Result: a dated brief with urgent changes, commitments, meeting preparation and a feasible next-action list, each tied to its source.

When to use it

Maintain a traceable project decision record.

What it covers

Inputs

Project, decision sources, intended memory destination/audience.

Result

Decision record with supersession links, source evidence and confirmed memory reference when saved.

What it uses

Project toolsSlackCalendarEmailDocumentsKeep memoryRead only
For developers

Retrieval instructions

Resolve people, accounts and projects by stable identifiers. Use only the sources this task needs. Cite the source and date for each finding. Keep source systems unchanged.

Data sources

Linear, Slack, Google Workspace, Keep memory.

Procedure

  1. Resolve inputs for Decision Log Continuity: project_key, program, milestone, time_window. Default time window: active program milestones this month (override if caller provides time_window). Ask only for missing.
  2. keep_memory_read first for cards tied to decision-log-continuity / project_key / thread , prior decisions, open tasks, handoffs, and pins the caller can see.
  3. Run keep_search with these skill-specific intents (keep meaning; adjust wording to corpus):

Related skills

Projects →
Dependency Map→Map explicit work dependencies and their current state.Designer Status Report→Prepare a designer project report. Uses time window, project key, person, launch.Engineer Status Report→Prepare a engineer project report. Uses time window, project key, repo, person.