Onboarding
Return From Leave Catch-up
Prepare a work-focused catch-up after an absence.
Configure this skill
The page and the file follow your answers.
CRM
Email
Chat
Documents
Calendar
Project tools
6 of 6 systems connected
KeepDirectMissing
Your assistantSKILL.md
Download ↓
When to use it
Prepare a work-focused catch-up after an absence.
What it covers
Inputs
Caller, absence interval, role/projects.
Result
Catch-up brief, changed context, handback items and current priorities.
What it uses
People recordsCalendarEmailDocumentsSlackProject toolsKeep memory
For developers
Retrieval instructions
Resolve people, accounts and projects by stable identifiers. Use only the sources this task needs. Cite the source and date for each finding. Keep source systems unchanged.
Data sources
Rippling, Google Workspace, Slack, Linear, Keep memory.
Procedure
- Call keep_status and report freshness for: Rippling, Google Workspace, Slack, Linear, Keep memory. If a required connector for Return From Leave Catch-up is disconnected or stale, say so up front.
- Resolve inputs for Return From Leave Catch-up: person, role, project_key, day_n. Default time window: ramp plan window (first 30/60/90 days) (override if caller provides time_window). Ask only for missing critical.
- keep_memory_read for open tasks, decisions, and handoffs relevant to Return From Leave Catch-up (filter out unrelated day-plan noise).